beautypg.com

Burnham MPC User Manual

Page 4

background image

KNOCKDOWN BOILER - EQUIPMENT CHECK LIST (Continued)

Component Description

Carton

Designation

on Bar

Code Label

Part

Number

Qty. Req’d. Per Boiler Size

4 Sect.

5 Sect.

6 Sect.

7 Sect.

8 Sect.

9 Sect.

10 Sect.

1

1 Sect.

12 Sect.

13 Sect.

14 Sect.

15 Sect.

16 Sect.

17 Sect.

18 Sect.

Parts Cartons (Continued)

(Continued)

Jacket Panel Cartons

(4 Cartons Required

per Boiler)

Jacket Uncommon Side

Panel Cartons

JC4- 4

101839-04

1

JC4- 5

101839-05

1

JC4- 6

101839-06

1

JC4- 7

101839-07

1

JC4- 8

101839-08

1

JC4- 9

101839-09

1

JC4- 10

101839-10

1

JC4- 11

101839-11

1

JC4- 12

101839-12

1

JC4- 13

101839-13

1

JC4- 14

101839-14

1

JC4- 15

101839-15

1

JC4- 16

101839-16

1

JC4- 17

101839-17

1

JC4- 18

101839-18

1

Flueway Baffle Cartons

Second Pass Flueway

Baffle Cartons

(Stainless Steel)

2FB-18

101840-01

1

2FB-24

101840-02

1

2FB-31

101840-03

1

2FB-38

101840-04

1

2FB-45

101840-05

1

2FB-51

101840-06

1

2FB-58

101840-07

1

1

1

2FB-65

101840-08

1

1

2FB- 72

101840-09

1

1

2FB- 78

101840-10

1

1

Third Pass Flueway

Baffle Carton

(Cold Rolled Steel)

3FB

101852-01

1

1

1

1

1

1

1

1

Water Trim and

Control Cartons

30 PSI Water Trim

& Control Cartons

WT30-A

101841-01

1

1

1

WT30-B

101841-02

1

1

1

WT30-C

101841-03

1

1

1

1

1

1

1

WT30-D

101841-04

1

1

50 PSI Water Trim

& Control Cartons

WT50-A

101853-01

1

1

1

1

1

1

WT50-B

101853-02

1

1

1

1

WT50-C

101853-03

1

1

1

1

1

80 PSI Water Trim

& Control Cartons

WT80-A

101854-01

1

1

1

1

1

1

1

1

1

WT80-B

101854-02

1

1

1

1

1

1

Flue Outlet Damper Carton - 7”

FODC7

102473-01

1

1

Flue Outlet Damper Carton - 8”

FODC8

102473-02

1

1

1

Flue Outlet Damper Carton - 10”

FODC10

102473-03

1

1

1

Flue Outlet Damper Carton - 12”

FODC12

102473-04

1

1

1

1

1

1

1

INSPECT SHIPMENT carefully for any signs of damage. All equipment is carefully manufactured, inspected and packed.

Our responsibility ceases upon delivery of Boiler to carrier in good condition. Any claims for damage or shortage in

shipment must be filed immediately against the carrier by the consignee. No claims for variances or shortages will be
allowed by Boiler Manufacturer, unless presented within thirty (30) days after receipt of equipment.

This manual is related to the following products: