beautypg.com

Burnham MPC User Manual

Page 47

background image

7

L.

Install Burner Swing Door (BSD) on Block Assembly

hinges, see Figure 31. Move BSD to front of boiler.
Position door on the Floor, standing up, perpendicular
to front of boiler (full open position).

Figure 1: Install Burner Swing Door

Figure 0b: Install Jacket Top Panels

- Viewed From Rear

Figure 0c: Install Jacket Rear

Top Panel -

Viewed From Rear

step 2. On 8 thru 18 section boilers, locate

intermediate top panel(s) and install in order of
assembly shown in Table XI. Position panel
between outer top corner panes. Slide forward
to engage locking tabs into slotted openings on
previously installed panel, see Figure 30b. Secure

rear flange with two (2) #8 x ½” lg SMS. Repeat
until intermediate panels reach supply manifold.

step 3. Position jacket rear top panel between outer

top corner panels behind supply manifold. Slide
forward until locking tabs are engaged into slotted
openings on previously installed panel. Secure
panel to rear clips on outer corner panels with two
(2) #8 x ½” lg. SMS. Refer to Figure 30c.

This manual is related to the following products: