beautypg.com

Burnham MPC User Manual

Page 57

background image

57

U.

Install Optional Split Jacket Panels for Burner Swing

Door (BSD) Cover (if applicable).

1. Open carton and remove contents.

2. Locate hanger bracket for BSD cover, secure to

jacket front panel with three (3) #8 x 1/2” hex head
SMS as shown in Figure 47.

3. Install left side BSD cover panel with offset bend as

shown in Figure 47. Engage hooks on outer edge of
panel through slotted openings on jacket front panel
installed on boiler. At the same time, engage top

flange of left cover panel behind hanger bracket, see
Figure 47, Detail ‘A’. Pull down on left cover panel

to lock hooks in slots and top flange behind hanger
bracket.

4. Install right side BSD cover panel using the same

procedure used on left cover panel. Before locking
panel in place, make sure right cover panel overlaps

offset flange of left cover panel.

5. Secure panels together at seam using six (6) #8 x

1/2” lg. hex head SMS, one (1) screw on top and

five (5) screws on the face as shown in Figure 47.

6. Locate Logo Plate shipped in Instruction Envelope.

Peel paper off adhesive strips and install by inserting
positioning tabs on rear of Logo Plate into slotted
openings in upper left corner of left cover panel as
shown in Figure 47.

Figure 7: Install Jacket Panels for Optional Burner Swing Door Cover

This manual is related to the following products: