To check the power-up tests – Agilent Technologies 01664-97005 User Manual
Page 103

To check the power-up tests
The logic analyzer automatically performs power-up tests when you apply power to the
instrument (during the boot-up sequence). The revision number of the operating system
shows in the upper-right corner of the screen during these power-up tests. As each test
completes, either "passed" or "failed" prints on the screen in front of the name of each test.
1
Disconnect all inputs, then insert the operating system disk into the disk drive.
2
Let the instrument warm up for a few minutes, then cycle power by turning off then
turning on the power switch.
If the instrument is not warmed up, the power-up test screen will complete before you can
view the screen.
3
As the tests complete, check if they pass or fail.
Performing Power-Up Self-Tests
passed
ROM text
passed
RAM test
passed
Interrupt test
passed
Display test
passed
HIL Controller test
passed
HIL Devices test
No Disk
Front Disk test
Troubleshooting
To check the power-up tests
5–15