beautypg.com

Overview, Contact closure is recommended, Connecting the switch – American Power Conversion PD150G6F User Manual

Page 67: Configuring and testing, Caution

background image

150kW InfraStruXure PDU—Operation and Configuration

59

How to Connect an EPO Switch to the PDU
and Test the Switch

Overview

Connecting the switch.

The

Emergency Power Off (EPO) switch
connects to the PDU user connection
plate. The figure on the right shows the
location of the user connection plate on the
roof of the PDU. Connect a switch using
one of the three following connections:

• Contact closure
• 24VAC
• 24VDC

Configuring and testing.

Configuring

and testing of the switch is done through
the EPO interface on the PDU monitoring
unit. The figure to the right shows the
PDU monitoring unit and the location of
the EPO LEDs and DIP switches.

Note

APC offers an optional InfraStruXure EPO System (EPW9). Contact your APC sales
representative, or visit the APC Web site (www.apc.com) for more information.

Caution

If you are not connecting an Emergency Power Off switch to the PDU, leave the
Arm/Test rocker switch on the PDU monitoring unit in the Test position.

Note

Contact closure is recommended.

1

2

3

4

AT

S E

N

AT

S

0

ATS

1

AT

S

2

EPO

Contact

– +

EPO 24V

AC/DC

Contact Inputs

Contact Outputs

USER INTERFACE

© 2001 APC

MADE IN USA

This manual is related to the following products: