150kW InfraStruXure PDU—Operation and Configuration

31

Operation

How to Apply Power to the System

1. Close (turn ON) the main circuit breaker

of the power source supplying power to
the InfraStruXure PDU.

2. Close (turn ON) the Main Input on the

InfraStruXure PDU.

3. Power the PDU distribution circuit

breakers:

a. Close (turn ON) the Main Output

circuit breaker on the PDU.

Note

After the Main Output circuit breaker has been closed (turned ON), both PDU
distribution panels will be energized.