beautypg.com

5 replacing desiccant and scrubber bottles, Replacing desiccant and scrubber bottles, N 9.5 – Campbell Scientific IRGASON Integrated CO2/H2O Open-Path Gas Analyzer and 3D Sonic Anemometer User Manual

Page 42: Zero span span gain

background image

IRGASON

®

Integrated CO

2

/H

2

O Open-Path Gas Analyzer and 3D Sonic Anemometer

11. Examine the measurements that were written down for span CO

2

, span

H

2

O, and zero air. Compute the drift in instrument gain using the

following equation:

meas

meas

actual

zero

span

span

gain

=

where,

span

actual

= known concentration of the span gas

span

meas

= measured concentration of the span gas

zero

meas

= measured concentration in zero gas.

Note that in the zero-and- span window of ECMon, span

actual

is reported to

the right of the box where the user enters the span dew-point temperature.

The software calculates span

actual

by taking into account the dew-point

temperature and current ambient temperature and pressure. The equations

used for this calculation may be found in Appendix B. If drift (offset or

gain) for CO

2

or H

2

O is excessive, it may be time to replace the desiccant

and CO

2

scrubber bottles (see Section 9.5, Replacing Desiccant and

Scrubber Bottles).

12. With zero air still flowing and measurements stabilized, click on the

Zero

CO

2

and H

2

O button in the ECMon zero-and-span window.

Air flow into the shroud should be close to the recommended rate.

If the flow is too low, the shroud will not be properly flushed; if it

is too high, the air pressure within the shroud will be too high, and

the analyzer will not be zeroed and spanned properly.

13. Remove the zero air source and replace it with the CO

2

span gas. Allow

the gas to flow through the shroud, maintaining a flow between 0.4 and 0.6

l/min. Wait for readings to stabilize.

14. In the zero-and-span window, enter the known concentration of CO

2

(in

ppm) in the box labeled

Span Concentration (dry) and press Span.

15. Replace the CO

2

span gas with an H

2

O span gas of known dew point.

Allow the gas to flow through the shroud; higher flows may be desired for

a couple of minutes to more quickly establish equilibrium before resuming

a flow between 0.4 and 0.6 l/min. Wait for the readings to stabilize.

16. Enter the known dew point (in C°) in the box labeled

Span Dew Point and

press

Span.

17. The zero-and-span procedure is now complete. Remove the shroud,

reconnect the IRGASON

®

temperature probe, and prepare the site for

normal operation.

9.5 Replacing Desiccant and Scrubber Bottles

If more than two years have passed since replacing the desiccant / scrubber

bottles within the IRGASON, or if the zero-and-span readings have drifted

NOTE

32