Pfadvantage cotton yield monitor, Ag leader technology – Ag Leader PFadvantage Cotton Yield Monitor Operators Manual User Manual
Page 115

PFadvantage Cotton Yield Monitor
Ag Leader Technology
Updating Operating Program
September 2005
4-39
Step
Action
1
Install the PFadvantage Cotton Yield Monitor Serial Port Upgrade
Utility program on your computer.
2
After program has been installed in Windows 95 or Windows 98,
click Start, Programs, PFadvantage Cotton Yield Monitor Serial.
3
On the Serial Port Upgrade Utility screen, click UPGRADE THE
PFadvantage Cotton Yield Monitor button and follow steps on the
screen.
4
Select a COM port number (usually COM1).
5
Switch PFadvantage Cotton Yield Monitor power OFF.
6
Connect PC interface cable to PORT 1 on PFadvantage Cotton
Yield Monitor.
7
Connect PC interface cable to the selected COM port of your PC
(usually COM1).
8
Click CONNECT and switch the PFadvantage Cotton Yield
Monitor power ON. "PC communication established" will be
displayed on the monitor.
9
Click HERE to select the upgrade file. The upgrade.pld file can be
selected from a floppy disk or a directory on the computer’s hard
drive.
10
The file you have selected will be displayed, if that is the correct
upgrade.pld file, click HERE in the bottom box to install.
11
The program will begin to prepare the PFadvantage Cotton Yield
Monitor to receive. A bar with twelve boxes will light up one-at-a-
time until PFadvantage is ready to receive the file.
12
When file transfer begins a new screen appears with Bytes
Transferred, Time Remaining, Percent Complete and Cancel to
stop upgrading.
IMPORTANT: If you press cancel while the file transfer is in
progress the PFadvantage Cotton Yield Monitor will not be
upgraded and the monitor will no longer have an operating
program. You will have to restart the serial port upgrade
process or upgrade from a memory card.
13
When file transfer is completed "Upgrade Completed
Successfully" will be displayed in lower right hand box on the
screen. Click EXIT then Yes, shut off the PFadvantage Cotton
Yield Monitor and disconnect PC interface cable.
14
Turn on the monitor and verify the new program has been installed
and is operating correctly
***