beautypg.com

HP 3PAR Application Software Suite for Microsoft Exchange User Manual

Page 90

background image

7.32

Running Recovery Manager as a Scheduled Job

3PAR Recovery Manager 4.1.0 For Microsoft Exchange 2010 User’s Guide

For example:

From -> C:\Program Files\3par\RM\Exchange\bin\

Type -> RMExch create -s MyExchangeServer -mdb MyMailboxDatabase

11

On the Schedule tab, further refine the scheduled task by selecting the frequency and

start time of the task.

12

Click Apply and then OK when finished.

Result: Virtual copies are created as you have scheduled. Depending on the policy set with

the Recovery Manager GUI, older virtual copies on the system may automatically be

removed if the number of virtual copies exceeds your specified maximum threshold (see

Setting Recovery Manager Policy Configuration

on page 6.6).