Rmexch validate, Running recovery manager as a scheduled job, Syntax – HP 3PAR Application Software Suite for Microsoft Exchange User Manual
Page 88: Description, Parameters, Example
RMExch validate
SYNTAX
(For Exchange 2010) RMExch validate -mdb
[-domain
(For Exchange 2007) RMExch validate -s
-t
DESCRIPTION
The RMExch validate command verifies the data integrity of the exchange database files in
the specified virtual copy that is already mounted on the system.
PARAMETERS
The following options are supported:
•
(For Exchange 2010) -mdb
•
(For Exchange 2007) -s
the storage group belongs.
•
(For Exchange 2007) -g
virtual copy timestamp belongs.
•
–t > - The already mounted timestamp for validation. • -domain - Optional. Specifies the domain to which the Exchange server or mailbox belongs. If this option is not specified, Recovery Manager for Exchange uses the local domain. WARNING! If the validation operation failed on the virtual copy, the failed virtual copy cannot be used for backup and restoration purposes. It is the responsibility of the user to manually remove NOTE: Use quotes ("") for names that include spaces. Example (For Exchange 2010) The following command validates the specified mailbox database. RMExch validate -mdb “mb2” -t 020405162103 (For Exchange 2007) The following command validates the specified Exchange database. RMExch validate -s bottlenosed -g sg2 -t 020405162103 Running Recovery Manager as a Scheduled Job In addition to creating virtual copies using the Command Line Interface, you can also schedule Scheduling Virtual Copies using the Recovery Manager GUI You can schedule virtual copies at the same time you create a virtual copy of a storage group. For . 88 Using the Recovery Manager CLI
the failed virtual copy.
automatic creation of virtual copies for a specific storage group using the Recovery Manager for
Exchange GUI or using Windows:
more information, see