beautypg.com

Service deletion, Physical service deletion – HP Matrix Operating Environment Software User Manual

Page 97

background image

2.

Unregister the VM host:

..\Program Files\HP\Insight Control virtual machine

management\clientapi\bin>cli unregisterAgent -host

3.

Retrieve the list of IP addresses registered as VM hosts:

..\Program Files\HP\Insight Control virtual machine

management\clientapi\bin>cli getHostIds

4.

Verify that the VM host IP address is no longer listed.

Storage Pool Entries defined in Insight Dynamics may not be shown under the Storage page in
Insight Orchestration console.

Issue

Possible cause

The Insight Orchestration console's Storage page has not been refreshed since changes are
made in ID's Manage Storage Pool page.

The storage pool entry is filtered out because it is invalid for Insight Orchestration to use.

Action

Refresh the Insight Orchestration Storage page.

Verify the storage pool entry in the ID Manage Storage Pool page to make it valid for Insight
Orchestration to use:

◦ Ensure the Storage Entry Operating System is correctly specified.

◦ Ensure the WWN is correctly specified.

◦ Ensure the LUN is correctly specified.

◦ Refresh the Insight Orchestration Storage page.

Service deletion

Physical service deletion

Troubleshooting items addressed in this section:

Insight Orchestration Delete Service request leaves “clean-me” logical servers

Insight Orchestration did not correctly erase the disk during deprovisioning.

An infrastructure service has been deleted, but I did not delete it.

A delete request has failed. The environment must be manually cleaned.

Insight Orchestration Delete Service request leaves “clean-me” logical servers

Issue

If using Insight Control server deployment, the job “Erase ProLiant ML/DL/BL Array
Configuration {LinuxPE}

” has not been modified for Insight Orchestration.

Possible cause

If using Ignite-UX, the client has not been set up with permission to run the erase disk job in HP
Systems Insight Manager.

If using Insight Control server deployment, follow Step 9 in the

Creating server deployment job

folders

procedure. The job must have only two steps:

Details

Task

Action

Wipe Disk

Run Script

Shutdown (if
available)

Power Control

Working with services

97