beautypg.com

KROHNE BM 102 Handbook User Manual

Page 11

background image

BM

102

11


Stilling wells

Tanks with floating roofs for petro-chemical applications: use a stilling well.

1 Stilling

well

2 Tank

3 Floating

roof

4

Product (petroleum applications)

5

Well fixed to tank base (no roof
deformation)

6 Sediment



1.3.3 Installation

instructions: Gauge - all applications


BM102 gauges are designed to be mounted on a suitable process connection on a tank or sump.
Install the gauge using two people to avoid damaging the probe. Support the housing and the
probe.


Installation of single and twin cable probe level meters

1

Caution :

Do not over-bend
probe!

2

Inserting the probe:

hold more than one
metre above the
opening to avoid
cable bending.