Side shots – Spectra Precision Survey Pro v4.6 Ranger User Manual User Manual
Page 205
Leveling
195
Side Shots
18. Prior to shooting a benchmark or
turning point, you can shoot any
number of leveling side shots to
compute the elevation for any arbitrary
points.
Enter the point name in the SS Point
field, and an optional description in the
Desc field. Since the horizontal
coordinates for the new point cannot be
computed from the leveling routine, you
must provide them manually in the N
and E fields. Once you tap Next > , you can begin taking the
necessary shots for the side shot in your shooting sequence, as
described in Step 7.
When you are finished, the new point will be stored, and you
will return to the previous screen where you can select the
next shot type. You will not advance to a new setup until
after a turning point or benchmark is shot.
Note: Once a stakeout or side shot sequence is performed, the
backsight for the current setup will be computed so any future shots
from the same setup will only prompt you for foresight shots.