Teledyne 3010PA - Split architecture percent oxygen analyzer User Manual
Page 74
Oxygen Analyzer
Part II: Analysis Unit
Part II: 3-5
Figure 3-3: Electrical Connector/Control Panel;
For safe connections, ensure that uninsulated tips of the wires do not
extend beyond the terminal block screws to which they are attached.
Voltage Selector Switch: Set the Voltage Selector switch to the source
voltage (110 or 220 V ac) that will be used to power the Analysis Unit
internal heater. Make sure the switch is set to the correct voltage BEFORE
making or energizing the power connections.
Power Connections: 115/230 V ac, 50/ 60 Hz power is required for
the heater that keeps the enclosure at a constant temperature. Connect per
standard power wiring codes. The connections are—
N Neutral, G Ground, H Hot.
Fuse Installation: Fuses are not installed at the factory. Be sure to
install the proper fuse (5
×
20 mm, 2 A) as part of installation. (See Fuse
Replacement in chapter 5, Maintenance.)
Solenoid and Sensor Signal Connections: The Remote Probe con-
nector on the Control Unit (Part I, paragraph 3.3) connects to the Analysis
Unit's Solenoid Valves and Sensor Signal terminals. See Figure 3-4. It
provides signals to control the solenoid valves which regulate the zero, span
and sample gas flow, and accepts the sensor and thermistor signals for
processing.