Warranty Validation - Form #113 (4-02)
JB Manual
WARRANTY VALIDATION FIELD START-UP REPORT
CUSTOMER:_________________________________
W.O. _________________
BURNER MODEL: ____________________________
BOILER MODEL: ________________________________
CONTROL CIRCUIT COMPONENT OPERATIONAL TESTING (Check if Okay)
Primary LWCO _______________ High Limit ____________________ Firing Rate Control __________________
Secondary LWCO _____________ Operational Control ____________ Low Fire Start Switch ________________
High Gas Press. Switch _________ Oil Press. Switch ______________ High Fire Purge Switch _______________
Low Gas Press. Switch _________ Air Flow Switch _______________ Other _____________________________
FIELD
COMBUSTION SETTINGS
OIL FIRED
GAS FIRED
Low
Med.
High
Low
Med.
High
Firing Rate
CO
2
O
2
Smoke or CO (ppm)
NOx (ppm)
Stack Temp. Net
o
F
Room Temperature
o
F
Overfire Draft “ WC
Breeching Draft “ WC
Water Temp.
o
F/Steam Press.
Air Inlet Shutter (“ Open)
Flame Signal Pilot
Flame Signal Main
Oil Noz. Press/Man. Gas Pres.
By-Pass Oil Pressure
Atomizing Air Pressure
Combustion Efficiency
Running Motor Amps & Volts
L1
L2
L3
Comments:
Having read the Manufacturer’s service manual as to the proper installation, start-up and service of the unit above, I
verify that the burner has been put into operation as specified, and that the above information and checks are com-
plete and correct.
START-UP BY _______________________________________________ Date _________________________
Company ___________________________________________ Phone No. ____________________________
Address ___________________________________________________________________________________
NOTE: Warranty Validation - Field Start-up report must be completed, signed, dated and the top copy sent to Webster
Engineering & Manufacturing Co., Winfield, KS 67156, to validate equipment warranty.