2 mounting post / base plate installation, 1 post mount operator – Controlled Products Systems Group 6050-080 User Manual

Page 12

background image

Page 2

X Y

Gate

Width

34 30.75 14

Ft.

30 26.50 12

Ft.

26 22.25 10

Ft.

1.2.1 POST

MOUNT

OPERATOR

1.

Screw the two mounting pipes supplied into the
operator mounting plate.

2.

Using Table 1 and Figure 2 determine where
POINT C on the mounting plate / pipe assembly
needs to be located. The location of this
assembly and the Y measurement is dependent
on the X measurement that you choose.

3.

X is the measurement from the center of the gate
hinge to the center of the gate bracket and defines the position of the A1 and A2
points.

4.

Once the location of POINT C has been determined, construct a form for the
concrete pad according to Figure 3 and place the assembly into the form. Note that
the depth of the pad is determined by soil conditions and local building codes.

5.

Determine the height of the assembly required for your installation. Refer to Figure 4.

6.

IMPORTANT!! Prior to pouring concrete to anchor the mounting plate / pipe
assembly, be sure that POINT C is located correctly and that the mounting
plate is level and at the correct height.
Conduits can be run into the pad as
required.

7.

Let the concrete cure for 48 hours before proceeding with the installation of the gate
operator.

1.2 MOUNTING POST / BASE PLATE INSTALLATION

Table 1

Figure 2

12 min

9 3/4

X

Gate Closed

G

a

te O

pen

90°

Fence

Pilaster

A2

A1

Point C is the

intersection of the A1-A2
line and the output shaft.

See Detail A.

Y

A1-A2 Line

Point C

Mounting

Plate

Detail A

Output

Shaft

Gate

Bracket