Installing a fusion spigot (pe, pp or pvdf) – Burkert Type S020 User Manual
Page 36

36
Installationandcommissioning
Type S020
Flow direction
Marking of the flow
direction
Polarizing pin
→
Position	the	pola-
rizing	pin	opposite	
the	flow	direction.
Polarising pin
α
α
→
Align	the	polarizing	
pin	(a	<	3°)	in	the	
axis	of	the	pipe.
→
Tip	4	points	at	90°	
from	each	other.
→
Weld	around	the	
entire	circumfe-
rence	of	the	fusion	
spigot.
Fig. 13: Installing a welding socket, for measuring devices with a
clamp connection
7.2.6. installing a fusion spigot (pe, pp or
pVdf)
ø 40 mm
→
Drill	a	hole	40	mm	in	dia-
meter	in	the	pipe.
Internal	pola-
rising	slot
External	pola-
rising	slots
α
α
→
Position	the	oblong	
internal	polarising	slot	
opposite	the	flow	direction.
→
Align	2	of	the	4	external	
polarizing	slots	(a	<	3°)	in	
the	axis	of	the	pipe.
Weld
→
Weld	around	the	entire	cir-
cumference	of	the	fusion	
spigot.
Fig. 14: Installing a fusion spigot (PE, PP or PVDF)
English
