5 electrical installation with cable gland – Burkert Type 8793 User Manual
Page 33
33
Electrical Installation
Type 8792, 8793
*** Connect the Pt 100 sensor via 3 cables for cable com-
pensation reasons. It is essential to bridge Pin 3 and Pin
4 on the sensor.
When the operating voltage is applied, the process controller is
operating.
→
Now make the required basic settings and actuate the automatic
adjustment of the process controller. The procedure is described
in chapter“16.3 Start-up Type 8793”.
14.5 Electrical installation with cable
gland
DANGER!
Risk of injury due to electrical shock!
▶ Before reaching into the device or the equipment, switch off the
operating voltage and secure to prevent reactivation!
▶ Observe applicable accident prevention and safety regulations
for electrical equipment!
WARNING!
Risk of injury from improper installation!
▶ Installation may be carried out by authorized technicians only and
with the appropriate tools!
Risk of injury from unintentional activation of the system and
an uncontrolled restart!
▶ Secure system from unintentional activation.
▶ Following installation, ensure a controlled restart.
Using the 4 – 20 mA set-point value input
If several devices of Type 8792/8793 are connected in series
and the power supply to a device in this series connection
fails, the input of the failed device becomes highly resistive.
As a result, the 4 – 20 mA standard signal fails.
In this case please contact Bürkert Service directly.
english