Figure 24 — controller, Figure 25 — controller default home screen – Alpha Technologies AMP24 HP User Manual
Page 47
![background image](/manuals/317348/47/background.png)
45
Doc. #: 0260011-J0 Rev B
Starting-up the system
11. Switch on the AC mains/utility power.
12. Refer to illustration "AC Wiring" on page 38 and verify the AC input
voltages at the AC wiring terminals:
System
Voltage
Value
ALL
Neutral to Earth Ground
~0V
3 phase
L1 to L2, L2 to L3, L3 to L1
~208V
Neutral to L1 / L2 / L3
~120V
2-pole
L1 to L2
~208V
Neutral to L1 / L2
~120V
Split Phase L1 to L2
~240V
Neutral to L1 / L2
~120V
13. Check that the battery polarity is correct.
14. Turn on the AMPS24 DC Input breakers for each installed shelf.
15. Switch on the external battery breakers or complete the fuse circuit.
16. Verify that the system starts up and that the controller switches on:
the controller display initializes with three LEDs blinking while a self-
test runs for 15 seconds. (Ignore any alarm conditions indicated by
the bottom two LEDs.)
The graphic display shows the correct DC voltage.
Figure 25 — Controller default home screen
Figure 24 — Controller
- AlphaCell GelCell Series (32 pages)
- FXM 650, 1100, 2000 UPS (96 pages)
- Cordex 48-1.2kW (68 pages)
- Radium MiniBay (57 pages)
- Fiber Backhaul Enclosure (FBE) (19 pages)
- FBE2322 Enclosure System (38 pages)
- FlexNet PMR, GMR Series (49 pages)
- Te25xh (38 pages)
- FlexNet MPS48-12M - Technical Manual (33 pages)
- FlexNet MPS48-12M - Quick Start Guide (2 pages)
- FlexNet ELPM 300-48D (25 pages)
- FlexNet FMPS (40 pages)
- FlexPoint AX Series (34 pages)
- FlexPoint FPR1207-F - Technical Manual (18 pages)
- FlexPoint FPR1207-F - Quick Start Guide (2 pages)
- AlphaGen PN-6x-T 7.5kW 48VDC - Installation and Operation Manual (79 pages)
- AlphaGen CE-3x2 5K-T 48Vdc (95 pages)
- AlphaGen PN-6x-T 7.5kW 48Vdc (95 pages)
- AlphaGen 3.5_5.0kW Kohler COM5 (80 pages)
- Security Bar Field For UPE-3, UPE-6, UPE-M3, UPE-M6, PN Series and CE Series (2 pages)
- AMPS80 HP (116 pages)
- 255A Bypass Switch (24 pages)
- FXM350_Micro350 UPS (112 pages)
- CFR 600, CFR 600XT, CFR 1000 (70 pages)
- BPS Series Bypass Switch (36 pages)
- CFR Intelligent Interface Device (54 pages)
- CFR Redundant Control Unit (23 pages)
- CFR 5000, CFR 5000RM (88 pages)
- CFR 3000, CFR 3000RM (86 pages)
- CFR 1500, CFR 1500RM (83 pages)
- CFR 1500, CFR 2000, CFR 2500, CFR 3000 (76 pages)
- Continuity: 1000_2000_3000 (48 pages)
- Continuity Battery Pack (20 pages)
- Continuity: 6K_10K (52 pages)
- Micro, Micro XL, Micro XL3 UPS (99 pages)
- Micro Secure UPS (80 pages)
- Te17 (32 pages)
- Te45 (68 pages)
- Te41, 48V (76 pages)
- Te41, 24V (72 pages)
- Te43 (60 pages)
- AlphaGuard AG-CMT Installation (2 pages)
- AlphaGuard AG-CMT-3SC_4SC-P (2 pages)
- Digital Midtron DM-3200 AT (2 pages)