beautypg.com

Generator run report 3, Print test report 3, Space – Franklin Fueling Systems Tank Sentinel (TS-1001, 2001, 504, 508 & 750) Operators Guide Rev. D User Manual

Page 62: Regulatory report

background image

Tank Sentinel Reports

Page

3 - 27

3

Regulatory REPORT

This report can be sent to the regulatory agency for compliance
verification. It shows the hardware status of equipment that
is part of the INCON Tank Sentinel system. The last 12
months of

PASSED

Static and SCALD tank leak tests, and

passed 0.2 gph line tests are shown. In addition, the last 0.1
gph annual precision line leak tests for all lines are shown.

Also see Leak Test and Line Compliance Test reports.

Press:

Press:

Report Choices

+

Regulatory Report:

Regulatory

M1

Choose Printer

or Fax

M4

J

W

REPORT

9

K

X

DOWN

SPACE

○○○○○○○○○○○○

○○○○○

○○○○