beautypg.com

4 rpa system - control bus connection, 1 - open the front door “ a ” of the ups cabinet, 2 - remove the front panel “ b – GE Industrial Solutions LP 33 Series 30 & 40 kVA Installation Guide User Manual

Page 32

background image

Modifications reserved

Page 32/41

OPM_LPS_3UI_30K_40K_0US_V010.doc

Installation Guide LP 33 Series 10-20 kVA

3.9.4

RPA system - Control bus connection

WARNING !

This operation must be performed by trained personnel before the initial start-up
(ensure that the UPS installation is completely powered down).

Access to the RPA board

1 - Open the front door A of the UPS

cabinet.

2 - Remove the front panelB.

3 - Remove with appropriate tool the

metallic window C from the metal

screenD.

LPS33U_030-040

_RPA connection

_01

OFF

ON

OFF

ON

B

C

D

Fig. 3.9.4-1 Access to the RPA board

NOTE !

Put in place the front screen
“A”
paying attention to not

damaging the control bus
cables.

LPS3

3U_0

30-

04

0_RPA

conn

ec

tio

n_GE

_02

J4
J3

LP 33 Series

1

P1

P13

P34

P1

J3

P13

J4

P34

LP 33 Series

2

J3

P1

P13

J4

P34

LP 33 Series

3

P34

J4
J3

P1

P13

LP 33 Series

4

Fig. 3.9.4-2 Bus connection RPA parallel system

Bus connection RPA parallel system
Connect the control bus cable between the parallel units as indicated in the diagram Fig. 3.9.5-2.
Provide that the connectors J3 and J4 are properly fixed with the included screws.

NOTE !

The jumper JP1 - JP2 - JP3 must be
removed only on the intermediate units,
where the connectors J3
and J4 are both
inserted.
Do not insert or remove J3
and J4 from
the board “P16 - Connector adapter RPA”

when the parallel system is operating.

P1

J3

P13

J4

P34

LP

S

33U

_0

30

-0

40

_R

P

A

c

o

nn

ec

tion

_0

3

JP1

JP2

JP3

Fig. 3.9.4-3 Connection to Board P16