6 unpacking – GE Industrial Solutions LP 33 Series 30 & 40 kVA Installation Guide User Manual
Page 19

Modifications reserved
Page 19/41
OPM_LPS_3UI_30K_40K_0US_V010.doc
Installation Guide LP 33 Series 10-20 kVA
3.6 UNPACKING
Move the equipment in it’s original packing, carton box or wooden case, until the place of installation
and remove the packing and the transport sockets only just before installing the UPS.
Procedure for the unpacking of the UPS:
1
• Make sure to have sufficient space
around the UPS before you start
unpacking.
• Cut the two straps “A” fixing the carton
box.
2
LPS33U_
030-040_
Unpackin
g_02
B
UL
GRAV
ITY
CENT
ER
of
of
GRAVITY
CENTER
D
C
Digital Energy
T M
LP Ser ies
• Remove package “B and C”.
• Remove the protection “D” outside the
cabinet and the accessories bag.
• Use a forklift to raise the UPS from the
floor.
• Remove the three wooden plates “E”.
3
LPS33U_
030-040_
Unpackin
g_03
Digi ta l En
e rgy T
M
LP Se ri
e s
E
E
E
Fig. 3.6-1 LP 33 Series unpacking sequence
NOTE !
Be aware of the heavy
weight of the UPS, in
particular if already
equipped with Batteries.
Included in the delivery you can find the following parts:
• CD-ROM connectivity
• Control Bus cables (only for RPA parallel system)
• An accessories bag
NOTE !
The wheels are designed only for limited movements on the installation site.