Battery discharge test, continued – GE Industrial Solutions Galaxy Verification User Manual
Page 41
Galaxy Power System Verification Procedures
Issue 3 January 2008
Galaxy SC Controller Performance Verification Procedures 2 - 29
Battery Discharge Test, continued
Discharge Menu,
continued
NUM STRING: Use the <+> and <-> keys to select the number of
strings installed on the site. (Range is 1 to 32 strings, default is 2.) Press
END V/CELL: Use the <+> and <-> keys to select the cell voltage at
the end of the discharge test. (Default value is 1.75V, and is adjustable
between 1.75V and 1.95V.) Press
BAT CLASS: Use the <+> and <-> keys to select flooded or sealed.
Press
controller is present.
Configuration
Configuration may be done locally at the front panel or remotely via
EasyView interface.
Basic: MENU
→ CONFIG.. → BAT TEST
Intelligent: MENU
→ CONFIG.. → BAT MNGR → BAT DISCH..
EasyView: CONFIG
→ BATTERY MANAGEMENT → RESERVE
To initiate the test, the plant must be operating in the Float mode with
no active alarms and only serial type rectifiers connected. The test can
be controlled either locally at the front panel or remotely via EasyView
interface by toggling the BAT DISCH TST software switch.
Basic: MENU
→ MAINT OPER.. → BAT DISCH TST
Intelligent: MENU
→ MAINT OPER.. → BAT DISCH TST
EasyView: CONTROL
→ BATTERY TEST