13

Gas sampling and gas conditioning technology

5-2.1.1-ME

13

STARTING

Before using the equipment for the first time, check that the safety measures specific to the installation
and process are complied with!

For the carried media the corresponding safety regulations and measures have to be considered.

W A R N I N G !

Before starting up check whether the mains power supply voltage
corresponds with the information stated on the nameplate.

Beware of touching the filter surface during operation. Serious
burns can occur because of high surface temperatures. Wear
protective gloves and protect the filter from unauthorized access.


The following procedure is recommended:

Check the rated value setting on the built-in thermostat.

N O T E !

If the rated value temperature needs to be lowered more than 30°C
in one step duration operation, the thermostat's excess
temperature switch-off is triggered (for re-start press reset key).

Switch on mains power supply.

N O T E !

The total heating-up time is approximately 30 minutes. After
exceeding the low temperature limit (30°C below set temperature)
the filter is ready for operation.

In case of low temperature alarm (failure of heating) the gas flow
has to be interrupted by adequate measures!