beautypg.com

Receipt of goods and storage, Installation instructions – M&C TechGroup ECP20-2 Operator's manual User Manual

Page 12

background image

12

Gas sampling and gas conditioning technology

3-1.10-ME

10

RECEIPT OF GOODS AND STORAGE

The ECP gas cooler is a complete pre-installed unit.

Please take the ECP gas cooler and possible special accessories carefully out of the packaging

material immediately after arrival, and compare the goods with the items listed on the delivery note!

Check the goods for any damage caused during delivery and, if necessary, notify your transport

insurance company without delay of any damage discovered

N O T E !

The equipment should be stored in a protected, frost-free room!



11

INSTALLATION INSTRUCTIONS

The ECP 20.. Peltier Gas Cooler is designed for wall mounting and panel mounting as well.

N O T E !

The Cooler is to be used in a vertical position only! The perfect functioning
of the separation and drainage procedures will only be guaranteed if the
equipment is used in a vertical position!

When in use, the ECP cooler should be placed in an area well away from any
heat emitting sources in order to prevent damage caused by an
accumulation of heat the air vents must be free at all times!

When the equipment is being used outside, ample protection against the
effects of direct sunlight and dampness must be provided. In winter, the
equipment must only be used in frost-free areas!

Unheated gas sample lines must be provided with slope up to the cooler. In
that case pre-separation of the condensate is not required.

Connect the heated sample line with sufficient thermal decoupling to the
cooler!