Shut-down, Maintenance – M&C TechGroup FSS-..._H350 Operator's manual User Manual
Page 12
![background image](/manuals/255954/12/background.png)
12
Gas sampling and gas conditioning technology
5-2.1.5-ME
14
SHUT-DOWN
SKILLED STAFF
The shut-down has to be carried out by skilled staff !
N O T E !
Before shut-down, i.e. switching off the heating, the probe be
flushed with inert gas or air in order to avoid condensation of
aggressive components from the process gas.
15
MAINTENANCE
The safety instructions specific to the plant and process are to be consulted prior to any maintenance
work!
SKILLED STAFF
Maintenance has to be carried out by skilled staff !
It is difficult to give any recommendations as to a particular maintenance cycle. Depending on your
process conditions, a meaningful maintenance cycle must be elaborated for the specific application.
An indication that filter-maintenance may be necessary could be shown by a constant decline in the
amount of sample gas in the analysis system.
Probe maintenance is restricted essentially to replacing filter elements and checking seals.
W A R N I N G !
Aggressive condensate is possible.
Wear protective glasses and proper protective clothing!
Flush the filter in case of toxic gases!
For maintenance work during operation:
High surface temperatures!
Touching the filter surface can cause serious burns!
Wear protective gloves and protect the filter of unauthorized
access!