Starting – M&C TechGroup FSS-..._H350 Operator's manual User Manual
Page 11
11
Gas sampling and gas conditioning technology
5-2.1.5-ME
13
STARTING
Before starting the gas conditioning system please pay attention to the site-oriented and process-
oriented precautions.
For the carried media the corresponding safety regulations and measures have to be considered.
SKILLED STAFF
The starting has to be carried out by skilled staff !
W A R N I N G !
Before starting up check whether the mains power supply voltage
corresponds with the information stated on the nameplate.
Beware of touching the filter surface during operation. Serious
burns can occur because of high surface temperatures. Wear
protective gloves and protect the filter from unauthorized access.
Check the rated value setting on the built-in thermostat (s. Fig. 2).
N O T E !
If the rated value temperature needs to be lowered more than 30°C
in one step duration operation, the thermostat's excess
temperature switch-off is triggered (for re-start press reset key).
Switch on mains power supply.
N O T E !
The total heating-up time is approximately 2 hours.
In case of low temperature alarm (failure of heating) the gas flow
has to be interrupted by adequate measures!