beautypg.com

Installation instructions, Supply connections, Hose connections – M&C TechGroup ECM Series Operator's manual User Manual

Page 11: Figure 4, Position of the gas and condensate, 12 installation instructions

background image

11

Gas sampling and gas conditioning technology

3-3.0-ME

12

INSTALLATION INSTRUCTIONS

The ECM cooler is suitable for wall mounting.

N O T E !


The operating position for this cooler is exclusively vertical. This is the
only way to ensure proper separation and removal of condensate in the
heat exchangers. During transport and installation, the cooler must
always be stood up with the transport feet positioned underneath so that
the oil in the closed compressor circuit cannot run out of the compressor
case.
The cooler should be kept away from sources of heat and well ventilated
when installed, so that condensation from warmth will not occur and
interfere with operation.
The minimum installation dimensions (fig. 2) must be followed without
fail. If the unit is installed in the open, the cooler must be installed in a
housing that is frost-free in winter and adequately ventilated in summer.
Avoid locating the unit in direct sunlight.
Unheated gas sample lines must be provided with slope up to the cooler.
In that case pre-separation of the condensate is not required. Connect the
heated sample line with sufficient thermal decoupling of min. 20cm to the
cooler!



13

SUPPLY CONNECTIONS

13.1

HOSE CONNECTIONS

The connection for sample gas inlet and outlet happens on the upper part of the heat exchangers. For
possible connectors see technical data (8.).


1

EC

M

Cooler

2

1 Gas inlet and outlet

2 Condensate outlet

3 Condensate outlet with optional

mounted peristaltic pump

3

Figure 4 Position of the gas and condensate

Correspondingly tube and hose connectors are optional available by M&C

.