Starting – M&C TechGroup SP 30-H.._EX2 Operator's manual User Manual
Page 14

14
Gas sampling and gas conditioning technology
2-1.9.6EXME
14
STARTING
W A R N I N G !
Before starting up check whether the mains power supply
voltage corresponds with the information stated on the
nameplate.
W A R N I N G !
Start up only the built-in heated probe tube because otherwise
there is a risk of burning !
W A R N I N G !
Check whether the housing of the heating controller and the
connection box of the heated sample tube are earthed. Earth
resistance <0,3 Ohm.
Switch on mains power supply.
Then inner temperature of the sample tube has to be measured during the heat-up phase.
The maximum temperature reached is the value for the temperature class. This has to be
taken from the table below. Adjust desired temperature via controller.
N O T E !
Function and correctness of the temperature control (temperature
class) is in the sole responsibility of the installer and operator.
The nameplate contains no information about the temperature class because this is
determined by the temperature controller only.
Temperature class
Operating/sampling temperature
°C
Limiter
°C
T2
280
290
T3
185
190
T4
120
125
T5
85
90