3 topology 0 / topology 1 (left or right), Topology 0 / topology 1 (left or right) -10 – Qualstar 501440 Rev. G User Manual
Page 65

7.6.3
Topology 0 / Topology 1 (Left or Right)
This value sets the Fibre Channel Option host topology. The “Topology” has two selec-
tions, LOOP and FABRIC. The LOOP selection configures the Fibre Channel Option
for Arbitrated Loop (FC-AL) operation. The FABRIC selection configures the Fibre
Channel Option for Switch Fabric (FC_SW) operation. If the mode is LOOP, the
Id
Mode
and
Loop Id
entries are available.
LOOP
The LOOP value configures the Fibre Channel Option for Arbi-
trated LOOP (FC-AL) operation.
FABRIC The FABRIC value configures the Fibre Channel Option for
Switch Fabric (FC_SW) operation.
7-10
The Configuration Menu
501440 Rev. J