beautypg.com

NEC 320Fc User Manual

Page 72

background image

Performing a Readiness Check

4-2

Express5800/320Fc: Active Upgrade™ User’s Guide

The activity log reports the overall results of the readiness check as well as the results
for each individual test.

Table 4-1

describes the general meaning of the activity log

entries.

The status bar at the bottom of the window indicates one of the following states for the
current operation:

Busy

A readiness check is in progress. Allow time for the task to complete.

Ready

The system meets the prerequisites for the Active Upgrade process. You can
proceed with the upgrade process by splitting the system.

Broken

One or more components in the system does not meet the prerequisites for the
Active Upgrade process. You must resolve the problem before you can continue
with the upgrade.

(For more information about interpreting Active Upgrade status, see

“Viewing Active

Upgrade Process Status” on page 4-21

.)

If the check is successful, you can click Split to proceed with splitting the system. See

“Splitting the System”

.

If one of the readiness tests fails, you must resolve the problem, then click Retry to run
the readiness test again. When the problem is resolved, you can click Split to proceed
with splitting the system.

Table 4-1. Activity Log Entries

Icon

Text Color

Severity

Description

Green

Success

Task completed without error

Black

Pending

Task is in progress

Black

Information

Task information, no action necessary

Black

Warning

A problem that should be addressed, but will not
block an upgrade

Red

Error

A problem that must be corrected before continuing
with upgrade