beautypg.com

Table 3-29 – Nortel Networks 450 User Manual

Page 213

background image

Using the Console Interface

302401-D Rev 00

3-81

Note:

The LED indications described in

Table 3-29

apply to a 24-port switch

model. Although a 12-port switch provides similar LED indications, the LED
indication sequence is associated within the 12-port range.

Table 3-29.

LED Indications During the Software Download Process

Phase

Description

LED Indications

1

The switch downloads the new
software image.

100 Mb/s port status LEDs (ports 18 to 24 only): The
LEDs begin to turn on in succession beginning with port 24,
which indicates the progress of the download process. When
LEDs 18 to 24 are all on, the switch has received the new
software image successfully.

2

The switch erases the flash
memory.

100 Mb/s port status LEDs (ports 1 to 12 only): The LEDs
begin to turn on in succession beginning with port 1, which
indicates that various sectors of the switch’s flash memory
are being erased. When LEDs 1 to 12 are all on, the switch’s
flash memory has been erased.

3

The switch programs the new
software image into the flash
memory.

100 Mb/s port status LEDs (ports 1 to 8 only): The LEDs
begin to turn on in succession beginning with port 1, which
indicates that the new software image is being programmed
into the switch’s flash memory. When LEDs 1 to 8 are all on,
the new software image has been programmed successfully
into the switch’s flash memory.

4

The switch resets automatically.

After the reset completes, the new software image initiates
the switch self-test, which comprises various diagnostic
routines and subtests.

The LEDs display various patterns to indicate that the
subtests are in progress. The results of the self-test are
displayed briefly in the Self-Test screen, after which the CI
screens appear.

kombk.book Page 81 Tuesday, June 29, 1999 3:25 PM