Sun Microsystems Netra 120 User Manual
Page 198

Index-2
Sun Fire V120 and Netra 120 Server User’s Guide • December 2001
E
F
checking the status, 9-3
power supply, 8-23
checking the status of (remotely), 9-5
turning on, 8-22
field replaceable units, 11-4
filtering devices, external, 3-2
flooring, 1-10
front bezel, 4-6
G
grille
grounding
H
installing, 4-2, A-2
removing, 4-2, A-4
heat dissipation, 2-4
host name, 7-5
I
in-rush current, 2-2
installation
CD-ROM drive, 4-7
CD-ROM with cable and paddleboard, 11-7
DIMMs, 4-9
hard disk drives, 4-2, A-2
memory card reader, 11-5
new system board, 11-15
PCI cards, 4-11
rack mounting, 5-1
rear fan subassembly, 11-19
replacement NVRAM chip, 11-9
two-post relay rack, 5-12
insulated conductors, 3-3
internal circuit breakers, 9-3
J
jumpers
factory default settings, D-2
locating on the system board, D-4
L
LEDs
Ethernet link indicators, 10-13
power indicator, 10-12
Lights Out Management (LOM)
commands, 8-21
displaying the host name, 8-22
displaying the version number of the LOM
monitoring the system, 9-2 to 9-7
online documentation, 9-2
parameters, C-3
power supply unit, 9-2
powering up the system, 8-22
returning control of serial connection to
sample Event Log, 8-10, 9-7
setting the alarms, 8-21, 9-11
setting up named users, 8-13 to 8-17
stopping event reporting, C-3
turning the fault LED on, 8-22
updating component status, 8-21
viewing the LOM’s Event Log, 8-10