Chapter 4 performance checks, 1 test equipment setup, Chapter 4 – Motorola SSETM 5000 User Manual
Page 63: Performance checks -1, Test equipment setup -1, Figure 4-1. performance checks test setup -1
Chapter 4 Performance Checks
This chapter covers performance checks used to ensure that the SSE 5000 radio meets published
specifications. The recommended test equipment listed in the previous section approaches the
accuracy of the manufacturing equipment, with a few exceptions. Accuracy of the test equipment
must be maintained in compliance with the manufacturer’s recommended calibration schedule.
Checks should be performed if radio performance degradation is suspected.
4.1
Test Equipment Setup
Supply voltage can be connected from the battery eliminator. The equipment required for the
performance checks is connected as shown in
Figure 4-1. Performance Checks Test Setup
Initial equipment control settings should be as indicated in
and should be the same for all
performance checks and alignment procedures, except as noted.
BNC
NOT USED
AUDIO GENERATOR
SINAD METER
AC VOLTMETER
TX
RX
30 dB PAD
30 dB PAD
RF GENERATOR
SYSTEM ANALYZER
OR COUNTER
WATTMETER
MAEPF-27212-B
BATTERY
ELIMINATOR
RTL4224
TRANSMIT
RECEIVE
RADIO
PROGRAM/TEST CABLE
RKN4121 or RKN4122
AUDIO IN
SET TO APPROX. 450mV FOR Tx
MEASURE 80mV FOR Tx
TEST SET
RLN-4460_