Installation instructions, Installation – Stovax Studio 22 User Manual
Page 20
20
INSTALLATION INSTRUCTIONS
INSTALLATION
15
AR2134
• Put vertical studwork at minimum clearance to the side of
the fire (50mm)
• Secure to the vertical studwork through the holes in the
metal brackets fitted to the fire, Diagram 16
The kit has been designed so that non-combustible board
can be taken right up to the edge of the four brackets,
Diagram 17
16
AR2133
17
AR2085
Build the studwork chimney breast to the desired size:
• Ensure all clearances to combustible material are
maintained, Section 3, 3.1 above
• Decide on flue requirements
• Cut a hole for the flue exit - see Installation
Instructions, Flue Assembly
18
AR1902
• Fit non-combustible board to the studwork above and to
the sides of the fire. This should extend a minimum of
400mm above the appliance and a minimum of 50 mm to
each side
• Fit plasterboard to the remaining chimney breast front
• Connect the flue system and gas services using the
opening in the side of the chimney breast for access
After commissioning, finish the sides of the chimney breast,
Diagram 19
19
AR1911
Detail A
A
• Apply a plaster finish to the chimney breast