beautypg.com

Data sheet 1, General check, Power supply(ship’s main voltage) – Furuno FSV-24 User Manual

Page 69

background image

AP-2

DATA SHEET 1

General check

CK; DT: digital tester AT: analog tester OS:oscilloscope WC:watch

Check item

Content

Check point

CK

Standard

Judge

Connection All

connection

should be checked
refering to the
interconnection
diagram.

1.Transducer-transceiver unit
2.Processor unit-Transceiver unit
3.Processor unit-Control unit
4.Processor unit-Others equipment
5.Ship’s mains-Power supply
unit-Processor unit

WC

Refer to
installation
manual

Grounding All

grounding

should be checked
by installation
manual.

1.Monitor unit
2.Processor unit
3.Transceiver unit
4.Power supply unit
5.Junction box(Option)

WC

Refer to
installation
manual

Power Supply(ship’s main voltage)

Unit Check

point

CK

Standard

Result

Judge

Processor unit

CN-A110

DT AC100/110/115/220/230V

±

10

%

Transceiver unit

TB-B101 #1---#2

DT AC90V to AC115V

Power supply unit TB-D102

DT AC100/110/115/220/230V

±

10

%

Hull unit

TB-C101

DT AC220V


Note that: The input voltage may be dropped while the capacitors are being charged before
transmission. For accurate data, please check the voltages during TX on and off as well when you
check the input voltage of a transceiver unit.
The input voltage monitoring circuit in transceiver unit detects low voltage when AC 100V power
source drops to 85V. On the other hand, if the input voltage is 120 to 130V, the over voltage flag is
set and an alarm is displayed to monitor.

This manual is related to the following products: