beautypg.com

5 installation, 1 connection of protective, 2 led power on sequence – ATL Telecom AM200 User Manual

Page 19: 3 lcd power on sequence, 4 default settings, Installation, Connection of protective earth, Led power on sequence, Lcd power on sequence, Default settings

background image

ATL User Guide

AM200 Modem

19

5

5

INSTALLATION

This chapter describes the basic steps that are required to set up a system using the AM200 DSL modem.
It is recommended that if two desktop units are to be connected they should be tested back to back to check
for operation before deployment.

5.1

CONNECTION OF PROTECTIVE EARTH

If a G703 port needs to be connected to a circuit that is defined as TNV, then a protective earth must be
connected to the earth bond stud on the rear panel. See the Safety Statements at the front of this User
Guide.

5.2

LED POWER ON SEQUENCE

The TEST LED is red during the boot sequence and self-test.

Followed by all LEDs flashing orange for 45 seconds.

Followed by normal operation.

5.3

LCD POWER ON SEQUENCE

On power-on, and after a button inactivity timeout, the LCD display will revert to a status display. The upper
LCD display line will show the product name, management mode and DSL mode, while the lower LCD display
line will show the DSL and userport states (Up, Errored, Down or Disabled) in rotation.

AM200:Master:Co
Line:Up

This display, and some of the 'Show' sub-menu items, is refreshed automatically every two seconds.
Pressing any one of the three buttons will wake-up the LCD.

5.4

DEFAULT SETTINGS