Modifying backup specifications, Scheduling backup specifications, Scheduling example – HP A.06.11 User Manual
Page 190: 190 scheduling backup specifications, Scheduling backup, Specifications
Description
Option
Specifies non-database files of the Oracle SAP R/3 environment
to be saved.
Save these files in a separate backup session.
Objects outside
database
NOTE:
The total number of sapback processes started in one session using Data Protector is
limited to 256.
Modifying backup specifications
To modify your backup specification, click its name in the Scoping Pane of the Backup
context, then click the appropriate tab, and apply the changes.
Scheduling backup specifications
You can run unattended backups at specific times or periodically. For details on
scheduling, see the online Help index: “scheduled backups”.
Scheduling example
To schedule Full backups at 8:00, 13:00, and 18:00 during week days:
1.
In the Schedule property page, select the starting date in the calendar and click
Add to open the Schedule Backup dialog box.
2.
Under Recurring, select Weekly. Under Time options, select 8:00. Under Recurring
Options, select Mon, Tue, Wed, Thu, and Fri. See
Click OK.
3.
Repeat
on page 190 and
on page 190 to schedule backups at
13:00 and 18:00.
4.
Click Apply to save the changes.
Integrating SAP R/3 and Data Protector
190