Installing a server in a rack, Tion, Sect – HP PROLIANT ML330 G6 User Manual

Page 32

background image

Setup 32

1.

Connect peripheral devices to the server ("

Rear panel components

" on page

9

).

WARNING:

To reduce the risk of electric shock, fire, or damage to the equipment, do not plug

telephone or telecommunications connectors into RJ-45 connectors.

2.

Connect the power cord to the rear of the server.

3.

Connect the power cord to the AC power source.

WARNING:

To reduce the risk of electric shock or damage to the equipment:

Do not disable the power cord grounding plug. The grounding plug is an important safety
feature.

Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible at all
times.

Unplug the power cord from the power supply to disconnect power to the equipment.

Do not route the power cord where it can be walked on or pinched by items placed against
it. Pay particular attention to the plug, electrical outlet, and the point where the cord

extends from the server.

Installing a server in a rack

The procedure to install the tray in the rack is similar to the procedures to install a server in a rack. For

more information, see the 2U Quick Deploy Rail System Installation Instructions that shipped in the rail kit.

CAUTION:

To avoid damage to the equipment, be sure that the rack rails are installed in a

predetermined location on the rack so that airflow clearance issues are resolved. For airflow

clearance information, refer to the documentation that ships with the server.

To install the component:

1.

See the "Installing the Product into a Rack" section of the 2U Quick Deploy Rack Rail System
Installation Instructions
to do the following:

a.

Install the component rails on the tray.

b.

Install the rack rails in the rack.