beautypg.com

Installation and assembly – MCZ Yari AIR User Manual

Page 25

background image

23

3-INSTALLATION AND ASSEMBLY

Technical Dept. - All rights reserved - Reproduction is prohibited

LOADING THE PELLETS

Fuel is loaded from the upper part of the stove by opening the door. Pour the pellets in the hopper. When empty, it will hold about one

15 kg sack.

To ease the procedure carry out the operation in two steps:

• 

Pour half of the contents into the hopper and wait for the fuel to settle on the bottom

• 

Then complete the operation by pouring in the rest

Never remove the protective grille from inside the hopper. When loading pellets, keep the bag from coming

into contact with hot surfaces.

This manual is related to the following products: