Installation and assembly – MCZ Yari AIR User Manual
Page 24

2
3
1
4
5
a
b
c
d
22
3-INSTALLATION AND ASSEMBLY
It is good practice to guarantee effective ventilation in the room during the initial start-up, as the stove will emit
some smoke and smell of paint.
Do not stand close to the product and air the room. The smoke and smell of paint will disappear after about an hour of operation, however,
remember they are not harmful in any case.
The stove will be subject to expansion and contraction during the start-up and cooling phases, therefore light creaking noises may be
heard.
This is absolutely normal as the structure is made of laminated steel and must not be considered a defect.
It is extremely important to make sure the product is not immediately overheated and the temperature is increased gradually, initially
using low power.
This will prevent damaging the ceramic or serpentine tiles, the welds and the steel structure.
DO NOT EXPECT HEATING EFFICIENCY IMMEDIATELY!!!
SETTINGS TO BE CARRIED OUT BEFORE THE INITIAL START-UP
Once the power cable is connected in the rear part of the stove, turn the switch (fig. d), also placed at the rear, to position (I). To switch the
stove on or off press keys 2 + 3 on the remote control (fig. a+b) or key 5 on the control panel.
The stove will begin its start-up phase, lasting approximately 15 minutes, and will then go into normal operation.
It is already possible to use the control panel during the start-up phase, however, the effect of this setting will only be
implemented once the stove is ignited.