3-INSTALLATION AND ASSEMBLY
PREPARATION AND UNPACKING
The YARI stove is delivered in a single package containing both the structure and the steel sides with the profiles (fig.1):
Open the packaging, take out the four screws that hold the product onto the pallet (fig.2); two on the right side and two on the left side
of the stove.
Set the product in the pre-selected place, making sure this complies with the requirements.
The product must always be handled in a vertical position and solely with a cart. Pay particular attention to the door and its glass,
protecting them from mechanical knocks that would compromise their integrity.
In any case, the product must always be handled with care. If possible, unpack the product near the place of installation. The packaging
materials are neither toxic nor harmful, and therefore no particular disposal measures are required. The end user is responsible for product
storage, disposal or possible recycling in compliance with the regulations in force.
FIGURE 1 - FLAT STOVE PACKAGE
FIGURE 2 - REMOVING THE
PACKAGE SCREWS