beautypg.com

Installation, Sub-panel and outlets (inverter loads), Dual in / dual out wiring – Magnum Energy ME Series User Manual

Page 37: 240 vac only in standby

background image

Page 29

©

2012 Magnum Energy, Inc.

Installation

240

VAC only

in standby

Main Panel

(Utility Power/Generator Input)

ME Series Inverter

AC Terminal Block

(AC input and output wiring)

DUAL IN / DUAL OUT wiring

AC HOT 1 IN

(fro

m Ma

in

P

a

nel)

AC HO

T 1
OUT

(to Sub-P

anel)

AC NEUT IN

(fro

m Ma

in

P

a

nel)

AC N

E

UT OUT

(to Sub-P

anel)

AC HOT 2 IN

(fro

m Ma

in

P

a

nel)

AC HO

T 2
OUT

(to Sub-P

anel)

Sub-Panel and Outlets

(Inverter Loads)

120

VAC

120

VAC

AC GROUNDS

(to/from

both panels)

ON

OFF

ON

OF

F

ON

OF

F

ON

OF

F

ON

OFF

ON

OF

F

ON

OF

F

ON

OF
F

ON

OF
F

ON

OF
F

ON

OF
F

ON

OF
F

ON

OF
F

30

Maximum

30-amp breaker

(double pole)

required to

inverter AC input

30

In mobile installations: neutral is typically not

connected to ground in the main panel.

ON

OF

F

ON

OF

F

ON

OF
F

ON

OF
F

ON

OFF

Figure 2-13, AC Wiring for Dual In - Dual Out Confi gurations