Installation, Sub-panel and outlets (inverter loads), Dual in / dual out wiring – Magnum Energy ME Series User Manual
Page 37: 240 vac only in standby

Page 29
©
2012 Magnum Energy, Inc.
Installation
240
VAC only
in standby
Main Panel
(Utility Power/Generator Input)
ME Series Inverter
AC Terminal Block
(AC input and output wiring)
DUAL IN / DUAL OUT wiring
AC HOT 1 IN
(fro
m Ma
in
P
a
nel)
AC HO
T 1
OUT
(to Sub-P
anel)
AC NEUT IN
(fro
m Ma
in
P
a
nel)
AC N
E
UT OUT
(to Sub-P
anel)
AC HOT 2 IN
(fro
m Ma
in
P
a
nel)
AC HO
T 2
OUT
(to Sub-P
anel)
Sub-Panel and Outlets
(Inverter Loads)
120
VAC
120
VAC
AC GROUNDS
(to/from
both panels)
ON
OFF
ON
OF
F
ON
OF
F
ON
OF
F
ON
OFF
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
30
Maximum
30-amp breaker
(double pole)
required to
inverter AC input
30
In mobile installations: neutral is typically not
connected to ground in the main panel.
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OFF
Figure 2-13, AC Wiring for Dual In - Dual Out Confi gurations