beautypg.com

Installation, Sub-panel and outlets (inverter loads), Dual in / single out wiring – Magnum Energy ME Series User Manual

Page 36

background image

©

2012 Magnum Energy, Inc

Page 28

Installation

Sub-Panel and Outlets

(Inverter Loads)

120

VAC

120

VAC

Main Panel

(Utility Power/Generator Input)

AC Terminal Block

(AC input and output wiring)

DUAL IN / SINGLE OUT wiring

AC HO

T

1 IN

(f

ro

m Ma

in
Pa
nel)

AC
HOT 2 OUT

(t

o Sub-Panel)

AC NE

UT
IN

(f

ro

m Ma

in
Pa
nel)

AC NEUT OUT

(to Sub-Panel)

AC
HOT 2 IN

(from Main P

a

nel
)

AC GROUNDS

(to/from

both panels)

ON

OFF

ON

OF

F

ON

OF

F

ON

OF

F

ON

OFF

ON

OF

F

ON

OF

F

ON

OF
F

ON

OF
F

ON

OF
F

ON

OF
F

ON

OF
F

ON

OF
F

30

Maximum

30-amp breaker

(double pole)

required to

inverter AC input

30

In mobile installations: neutral is typically not

connected to ground in the main panel.

ON

OFF

ON

OF

F

ON

OF
F

ME Series Inverter

Figure 2-12, AC Wiring for Dual In - Single Out Confi gurations