Installation, Sub-panel and outlets (inverter loads), Dual in / single out wiring – Magnum Energy ME Series User Manual
Page 36

©
2012 Magnum Energy, Inc
Page 28
Installation
Sub-Panel and Outlets
(Inverter Loads)
120
VAC
120
VAC
Main Panel
(Utility Power/Generator Input)
AC Terminal Block
(AC input and output wiring)
DUAL IN / SINGLE OUT wiring
AC HO
T
1 IN
(f
ro
m Ma
in
Pa
nel)
AC
HOT 2 OUT
(t
o Sub-Panel)
AC NE
UT
IN
(f
ro
m Ma
in
Pa
nel)
AC NEUT OUT
(to Sub-Panel)
AC
HOT 2 IN
(from Main P
a
nel
)
AC GROUNDS
(to/from
both panels)
ON
OFF
ON
OF
F
ON
OF
F
ON
OF
F
ON
OFF
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
30
Maximum
30-amp breaker
(double pole)
required to
inverter AC input
30
In mobile installations: neutral is typically not
connected to ground in the main panel.
ON
OFF
ON
OF
F
ON
OF
F
ME Series Inverter
Figure 2-12, AC Wiring for Dual In - Single Out Confi gurations