Mounting the String Monitoring Box

Page 12

Operating Instructions Powador Argus 16S DCS, 24S DCS_EN

Authorised electrician

6

Mounting the String Monitoring Box

Installation space

Ensure good access to the unit for installation or any service work that may later be required.

Maintain the following minimum clearances around the unit:

100 mm clearance between two string monitoring boxes installed side by side,

500 mm clearance between two stacked string monitoring boxes,

500 mm to cabinets, ceilings, etc.

To prevent integrated components from overheating, do not place the box where it would be exposed to direct

sunlight.

Wall

The unit is designed for vertical wall mounting.

Ensure that the wall has adequate load-bearing capacity and use appropriate fixing materials.

The wall surface must be as even as possible to prevent the housing from warping or losing its seal when it is screwed

onto the wall.

Be sure to install the string monitoring box in a sufficiently elevated place, especially in areas prone to flooding.

Installation at eye level makes it easier to read the display on the inside of the box.

CAUTION

Use suitable mounting parts.

Use only the supplied mounting parts.

Mount the string monitoring box upright on a vertical wall.

NOTICE

The Powador Argus string monitoring box meets the requirements of protection rating IP56 if all

cable fittings are used or suitably closed off. In order to ensure a long service life for your units,

make sure they are installed in a dry location where they are not directly at risk of weathering.

Figure 2: Dimensions of the string monitoring box

(in mm)

Figure 3: Dimensions of the string monitoring box

(in mm)