beautypg.com

2 confirming errors on the sc-com interface, 3 displaying the error delay time, Confirming errors on the sc-com interface – SMA SC 500HE-20 User Manual

Page 73: Displaying the error delay time

background image

SMA Solar Technology AG

10  Troubleshooting

Operating Manual

SCxxxHE-20-BE-BEN111210

73

10.2.2 Confirming Errors on the SC-COM Interface

The installer password is required to confirm an error on the SC-COM interface. The SC-COM
technical description contains a detailed description of the SC-COM interface.

1. If there is an insulation error, switch the insulation monitoring device back on.
2. Select the parameter "Ackn" and set it to "Ackn" (see section 5.2 "Changing

Parameters", page 34).

3. Confirm entry with [Save].

10.3 Displaying the Error Delay Time

Certain errors such as grid faults will cause the Sunny Central to shut down. If this happens, there is
a delay time before the Sunny Central can restart. This is referred to as the delay time of the error
(TmsRmg).
If the Sunny Central has a display, it will show the delay time when reading out the error.

1. Select the Spot Values tab on the SC-COM interface (see section 5.1 "Displaying Spot

Values", page 34).

2. View the delay time via the "TmsRmg" channel.

Handling errors

Errors should only be confirmed when they have been corrected.

This manual is related to the following products: