4  Setting Network

Operating Manual

SCxxxHE-20-BE-BEN111210

31

4 Setting Network

Before you can connect the inverter to a computer via the service interface or the Internet, the
SC-COM must be set up in the plant network. To allow multiple Sunny Centrals operating on the same
network, the SC-COM of each Sunny Central must be assigned a unique network address.

Figure 12: Example of a system network of 2 inverters with indicator lights