Commissioning the DC Subdistribution

The commissioning report of the inverter must be completed during commissioning.

Requirements:

☐ The DC load-break switch must be switched off.
☐ The DC main cables must be connected to the inverter or DC main distribution box and

disconnected from voltage sources.

☐ There is no reverse voltage from the inverter.
☐ Voltage supply to the DC subdistribution must be present.
☐ All connections must have been executed in accordance with this manual (see Section 6,

page 25).

☐ The correct polarity of all connections must be ensured and documented.
☐ The floor around the DC subdistribution must be firm and freely accessible.

Procedure:

1. Complete the commissioning report
2. Switch the DC subdistribution on (see Section 8.3, page 47).