SMA SB 5000-US User Manual
Page 25
SMA America, LLC
AC Voltage Configuration
SB50US-80US-IA-en-37
SB50US-80US-IA-en-37
25
The following figures display the correct arrangement of the jumpers for the 240 V Delta system
configuration: Note the order in which the inverters are connected to the phases.
Configuration Examples for Jumpers with 240 V Delta, 120 V Stinger
Configuration Examples for Jumpers with 240 V Delta, Grounded
When using grounded 240 V or 208 V Delta grids
• Connect terminal L2 to the grounded phase.
L2
L1
L2
L1
Inverter 3
Jumpers Settings
Inverter
1
Jumpers Settings
Inverter 2
Jumpers Settings
This manual is related to the following products: