beautypg.com

7 activating and setting sma optitrac global peak, Activating and setting sma optitrac global peak – SMA STP 5000TL User Manual

Page 46

background image

Procedure:

1. Select the parameter Operating mode of multifunction relay or Mlt.OpMode and set the

desired operating mode.

2. Once you have set the operating mode Self-consumption or SelfCsmp, you can configure

other settings:

• Select the parameter Minimum On power for MFR self-consumption or

Mlt.MinOnPwr and set the desired value. This will configure the power threshold from
which a load is to be activated.

• Select the parameter Minimum power On time, MFR self-consumption or

Mlt.MinOnPwrTmm and set the desired value. This will configure the minimum time for
which the power must have exceeded the minimum switch-on power threshold in order to
trip activation of the load.

• Select the parameter Minimum On time for MFR self-consumption or

Mlt.MinOnTmm and set the desired value. This will configure the minimum time for
which the load remains activated.

3. If you have set the operating mode Control via communication or ComCtl, select the

parameter Status of MFR with control via communication or Mlt.ComCtl.Sw and set the
desired value. This will configure the status at which the multifunction relay is controlled via a
communication product.

4. If you have set the operating mode Battery bank or BatCha, make further settings:

• Select the parameter Minimum On power for MFR battery bank or

Mlt.BatCha.Pwr and set the desired value. This will configure the power threshold from
which the battery is to be charged.

• Select the parameter Minimum time before reconnection of MFR battery bank or

Mlt.BatCha.Tmm and set the desired value. This will configure the minimum time which
must elapse after charging the battery before the battery can be charged again.

8.7 Activating and Setting SMA OptiTrac Global Peak

For partially shaded PV modules, you should activate SMA OptiTrac Global Peak and set the
interval at which the inverter optimizes the MPP of the PV system.
The basic procedure for changing operating parameters is explained in another section (see
Section 8.4, page 44).

Procedure:

1. Select the parameter OptiTrac Global Peak switched on or MPPShdw.IsOn and set to

On.

2. Select the parameter Cycle time of the OptiTrac Global Peak algorithm or

MPPShdw.CycTms and set the required time interval. The ideal time interval is usually six
minutes. This value should only be increased if the shading situation changes extremely slowly.

☑ The inverter optimizes the MPP of the PV system at the predetermined time interval.

8 Configuration

SMA Solar Technology AG

Operating Manual

STP5-10TL-20-BE-en-13

46

This manual is related to the following products: